SAM [#001]

Circular construction with Bast architects

Opdrachtgever:
BAST architects
Timing:
Q4 2018
Our first commercial realization.

Ecological and circular construction with Bast.

We designed this SAM for Bast, an architectural firm at the forefront of ecological and circular construction. With this ambitious project, our clients wanted to put it to the test to see how far we are in Belgium when it comes to applied modularity in the residential construction sector. A 120m² detached house is outside our normal target group of residential projects, but we couldn't turn down such an offer. With a total lead time of 10 working days, this project therefore became a real statement of the efficiency that can be achieved thanks to modular and prefabricated techniques and structural work.

Want to learn more about this property? Watch the tvplus movie “A forever home” at the following link: click here.

This project was nominated for the Belgain Building Award 2021. Click here for more information

# Bomen geplant:
6
CO2 uitstoot bespaard:
4.8T
No items found.
Deel dit project op

Compose your SAM

Choose one of the 5 pre-designed models, adjust the desired options and finish, and get an immediate insight into the cost.